Private investments in road construction

Private investments in road construction

Description of road

Project map
  • Distance between the Moscow City business hub and the Moscow Ring Road
  • An outbound highway with transition to the Odintsovo North Bypass Road

10,3 km

length of road

6

traffic lanes

at least 100 km/h

design speed

415 000 m2

roadway area

3

pedestrian crossings

at least 3,5 m

width of dividing strip

No traffic lights

traffic features

8,9 km

length of engineering structures

22,8 km

total length of structures

at least 40 000

vehicles per day –
throughput capacity

Railway easement area

main location

Project features

40 years

duration of concession
agreement

roughly RUB 40 billion

total funding

Maximum toll to be
established by the city

City does not guarantee a return on the project

Return on investment by
collecting tolls

Removal and demolition works at the construction site are funded by the city

100%

  • Of the road construction is funded by an investor

50/50

  • preparation of territory
    (relocation of utilities)

Current project status

  • Concession agreement concluded

Contracts concluded for the lease of
146 land plots (57,6 ha)

Easements documented for
40 land plots (1,8 ha)

Design documentation
prepared
and is undergoing
the expert evaluation procedure

Planned start of construction – 2018

Description of road

Project map

106,4 km

length of road

at least 100 km/h

design speed

No traffic lights

traffic features

Railway easement area

main location

Innovative system of barrier-free toll collection

to be introduced

Connection between highways

Moscow – St. Petersburg
and Moscow – Kazan (oncoming)

Project features

The investor finances:

RUB 45 billion

construction of a road section

RUB 5 billion

construction of barrier-free toll collection system

Entire road transferred to investor for toll operation

Road provided to investor after all sections are commissioned (2020)

Investor maintains and operates the entire road

Concession period of 49 years