Industrial Zone YuB-1 "Yuzhnoe Butovo", parcel 2 (SWAD)

Brief description of the industrial area

State:
Soon to be released
Planned auction times:
for detailed information see: www.investmoscow.ru
Address, cadastrial number of the land plot:
77:06:0012017:1935 Moscow, driveway under project N185, 1, bld 4 (near)
Functional designation of the project:
Note:Allowed to place facilities of fourth and fifth health hazard classes (save for food and pharmaceutical industries) in line with SEO list 2.2.1/2.1.1.1200-03. Drug and medicine production facilities, warehouses for raw materials and semi-finished goods for pharmaceutical enterprises, food industry facilities, wholesale warehouses of food ingredients and foods may not be sited here. Part of the land plot that is intended for infrastructure facilities and/or is occupied by infrastructure facilities is not subject to city planning regulations. This section of the land plot may not be used for capital development or redevelopment.
Functional designation of the land:
land designated for industrial development
Plot:
0.96 Ha

Transport accessibility

Availability of a railway line (passenger or freight):
Butovo and Shcherbinka platforms of the Kursk line of the Moscow Railway
Motor roads (road class, number of lanes):
Varshavshkoe Expressway, streets under development ## 188 and 189

Basic economic parametres of the planned project

Square:
16,100.00
Number of floors:
6+1 underground floor
Development density:
15 sq m per hectare
Maximum percentage of built-up territory:
0,32

Tentative (Preliminary) cost of connections to engineering services (utility grids)

Water supply:
capacity: 45.0 cu m/day, connection fee – 12.3 m rubles.
Domestic sewage:
capacity: 45.0 cu m/day, connection fee – 36.3 m rubles
Storm water runoff:
connection fee – 12.9 m rubles.
Heat supply:
Capacity: 3.0 Gcal/h, connection fee – 13.5 m rubles
Power supply:
Capacity: 1000 KW, connection fee – 20.4 m rubles
Gas supply:
the volume and cost of works will be determined by the project based on the technical specifications of Mosgaz
Brief description of the industrial area
Transport accessibility
Economic parametres
Engineering support: current state / reserve
Engineering support: current state / reserve
How do I start a project? Инфографика как начать проект