Industrial Zone "Rudnevo", parcel 1 (EAD)

Brief description of the industrial area

State:
Soon to be released
Address, cadastrial number of the land plot:
77:03:0010010:3236 Moscow, PZ Rudnevo, driveway under project 287, parcel 1
Functional designation of the project:
Siting of the following facilities is possible: technoparks, technopolises, business incubators, warehousing (logistics and sorting centres); office buildings. Priorities for technoparks and technopolises: - electrical equipment; - pharmaceuticals (manufacture of dosage forms without preparation of API); - medical equipment; - IT; - computer hardware. Note: Part of the existing SPZ of a waste incineration plant and the estimated SPZ of a Metro depot. The siting of plants with class 4 or 5 health hazard is possible in accordance with the list of SanPiN 2.2.1/2.1.1.1200-03
Functional designation of the land:
Mixed business-community and industrial development
Plot:
7.69 Ha

Transport accessibility

Availability of a railway line (passenger or freight):
Lyubertsy railway station of Kazansky and Ryazansky routes. People may get there by city buses.
Motor roads (road class, number of lanes):
The existing roadway – driveway under project 597, driveway under project 265, speedway Moscow – Noginsk – Kazan is in the pipeline
Availability of the subway station:
Vykhino, Novokosino – people can get there by functional bus routes. Subway station Lukhmanovskaya is in the pipeline.

Basic economic parametres of the planned project

Square:
115,000.00
Number of floors:
3-16 + 1 underground floor
Upper height limit for buildings and structures:
85 metres
Development density:
30 000 sq m per hectare
Maximum percentage of built-up territory:
0,47

Tentative (Preliminary) cost of connections to engineering services (utility grids)

Water supply:
Capacity: 1200.0 cu m/day, connection fee – 25.2m rubles
Domestic sewage:
Capacity: 1200 cu m/day, connection fee – 115.5m rubles
Storm water runoff:
Surface drainage costs are determined by the project
Heat supply:
Capacity: 34 Gcal/h, connection fee – 160.7m rubles
Power supply:
Capacity: 24,000 KW, connection fee – 496.1m RUB
Gas supply:
the volume and cost of works will be determined by the project based on the technical specifications of Mosgaz
Brief description of the industrial area
Transport accessibility
Economic parametres
Engineering support: current state / reserve
Engineering support: current state / reserve